
Table tops
Butcher Block Solid Wood Table Top
- Solid wood top
- Indoor use
Wood table tops
Make your choices below to see the exact price.

The picture is one view of this model. We record the finish and size you choose on your order.
Wondering about this piece? Talk to a specialist
Start with the Outdoor Teak Table Top when choosing table top furniture for patios, rooftop bars, sidewalk seating, and poolside dining. You can place this model on a patio or bring it into an indoor room. Your shape choices are rectangular, square, round. Work through the seating sizes before choosing the top: 24 inch square, two; 30 inch square, two with plate room; 36 inch square or 42 inch round, four; 48 inch round, five or six.
Across the top, the material is wood at 1" in thickness. Keep these care notes with your closing routine. A damp wipe suits the wood finish. Dry any water collecting near the joints. Soapy water helps clean resin and faux teak, as well as woven surfaces; rinse the dirt away.
Take the top size outside on a paper plan before repeating it. The space behind a chair matters as much as the tabletop outline.
The options to settle are a choice among 7 versions of table size, such as 24" Diameter, 24" x 24", and 24" x 30". Save this selected version to your patio plan, with its quantity and the place you intend to use it.
Price checked on Oct 25, 2026.
Questions worth asking
Work through the seating sizes before choosing the top: 24 inch square, two; 30 inch square, two with plate room; 36 inch square or 42 inch round, four; 48 inch round, five or six.
A damp wipe suits the wood finish. Dry any water collecting near the joints. Soapy water helps clean resin and faux teak, as well as woven surfaces; rinse the dirt away.
Work through table size with 7 choices available. Each selection changes the shown price; the basket keeps that chosen version.
You can use it on the patio, with covering or storage included in your off-season routine.
The order travels by freight truck after email confirmation of the goods and freight quote. Standard lead time is 14 to 21 business days, plus transit; custom work takes longer. Plan the unloading arrangements.
Related reading